Case 03
project name
Liangshan Qianneng Bio-Power Co., Ltd. Cogeneration Project
Construction unit
Liangshan Qianneng Bio-Power Co., Ltd.
Construction site
Economic Development Zone, Liangshan County, Shandong Province
Installation plan
2×75t/h high temperature and high pressure biomass circulating fluidized bed boiler + 1×C30MW extraction-condensing steam turbine generator set and supporting facilities
The scope of work
Survey and design, procurement, construction EPC general contracting
project date
2017/12-2019/2
Project Description
This project is an EPC general contracting project with a total investment of 239.3 million yuan. After the project is completed, it can process 302,600 tons of agricultural and forestry waste, and can also solve the problems of industrial steam use in the industrial park and heating of nearby residents.