1/1
Number of views:
1000

Shandong Feixian Bioenergy Comprehensive Utilization Project

Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Category
New energy
Quantity
-
+
Stock:
0
Detail

project name
Shandong Feixian Bioenergy Comprehensive Utilization Project

Construction unit
Shandong Yongneng Biothermal Power Co., Ltd.

Construction site
Feixian, Shandong

Installation plan
This project is 2×75t/h high temperature and high pressure biomass circulating fluidized bed boiler + 1×C25MW extraction-condensing steam turbine generator set

The scope of work
Preliminary design, construction drawing design, as-built drawing design and related service work

project date
Commenced power generation in December 2018

Project Description
The biomass power generation project using gray straw (mainly bark) and yellow straw (wheat, corn, straw) as the main fuel is a clean, renewable energy and comprehensive utilization project of resources

We could not find any corresponding parameters, please add them to the properties table
Back
Username used for comment:
客户留言
Description:
验证码

Welcome to call the hotline information or pay attention to the official WeChat of Zhongheng Huayi!

Business

Copyright © Shanghai Zhongheng Huayi New Energy Co., Ltd. All Right